Saturday, March 21, 2009
L-girders are up!
We were able to install the L-girders tonight. Thanks to a lone of a laser level from Iron Mike, we were able to get a very level straight line. The pre-made joist were screwed into the studs in the wall with 2 1/2" drywall screws. Gusset plates were put over each joint. The assembly goes all around the room and is ready for more benchwork.
We also laid out the line for the L-channel that holds the drop ceiling. The crew worked from 7:30 to midnight. Steve, Paul, Bob and my neighbor Mike all dropped in.
The team spent some time talking about how to put the pilings in for the track work. I like the idea of the flex-pilings, and we may try that. Bob had some great ideas about how to put the pilings in. Basically, we are going to have to run some tests. Total time tonight was 4.5 hours.
We also laid out the line for the L-channel that holds the drop ceiling. The crew worked from 7:30 to midnight. Steve, Paul, Bob and my neighbor Mike all dropped in.
The team spent some time talking about how to put the pilings in for the track work. I like the idea of the flex-pilings, and we may try that. Bob had some great ideas about how to put the pilings in. Basically, we are going to have to run some tests. Total time tonight was 4.5 hours.