Sunday, March 29, 2009
Planning
Some of the work is already done in that I gave a clinic on swamp scenery and building cypress trees a few years ago. I'll take that and my collection of pictures and put it together, then present it one rainy night in Georgia over coffee and donuts.
What fun!
Saturday, March 28, 2009
Trip to the Store!
Today I needed some supplies and was a little tired from my dieting and heavy exercise, so I went to the store. Here's what I bought:
Michael's (a hobby and craft store)
- Selection of hardwood dowels: 7/16", 5/16", 1/4", 3/16" and 1/8". One each, all 36" long. (for testing swamp piling bridge assemblies)
- 8x10 picture frame for my buddy Iron Mike's photo (to do something nice for Mike who gives his all to the hobby)
- Bag of craft sticks, 5 3/4 x 1/4 x 3/32 inches - 75 per pack with a smooth finish (mixing resin and for scale model construction)
- 5 oz bottle of Aleene's Original Tacky Glue (the best for assembly of most things)
- 2 oz bottle of Ceramcoat Rain Grey acrylic paint (brick morter for the packing plant)
- 8x10 glossy photo of Iron Mike standing next to the Coal River Railroad Layout (to do something nice for Mike)
- Package of 80 cotton rounds pads (for painting and absorbing glue)
- Roll of aluminum foil (various uses)
- Two packs of 50 pipe cleaners ( the big ones) for cleaning air brushes
- Two rolls of 1" x 60 yds masking tape (for taping down items to paint and masking)
- Three disposable lighters (for lighting candles, heat source, torch lighting)
- Set of 6 jumbo clothes pins (clamps made of plastic)
- Small 2 1/2" x 3" mirror (for checking straight lines and edges)
Wednesday, March 25, 2009
Found a Fellow Swamper!
My layout is considerably smaller. The main theme for my scenery is going from the swamp to the seashore with various things in between. Actually, I started working from the swamp (in the far corner of the layout) as far as scenery goes. Then there was about a 2 year hiatus – no good reason, just stopped. Finally, this year I have started up again. By the way, if you look at the swamp, you can see how – gosh! I just went to my web site and hadn’t realized how out of date it was. Will take some new photos and post them tonight!
At any rate, I used plexiglass to be the swamp water (with dark brown paint under the glass). I want to virtually cover the glass with water lilies, etc, but that is for a future time when the scenery is more complete. I also used ½” dowel cut down the middle for the “trestle” over the swamp. Hope you can see the alligator and the osprey nest!
The current plan is to keep the theme of a logging railroad, but add the extra themes of grain, oil, passengers, and cattle. Oh yes, I have an operating lighthouse that will be a star attraction on the other end of the railroad from the swamp.
I have gone from HO to O because of the handling and building requirements. So, when I went to O, I decided to go to the 3-rail system. A lot is not to scale, and a lot is just funny, but it’s my railroad. I hope to have a working giraffe car on the layout soon! Don’t know how that fits with the theme, but it will have to. My boys (23 & 31) demand it!
I have gone on way too much. Thank you for your kind words of encouragement. I hope your layout works out well. I am still trying to get my hands around the water part. I will actually have seashore with abandoned track and bridge (sand dunes) on one part of the layout.
Sam
Sunday, March 22, 2009
A Little Help From a Friend
What I needed were some detailed photos and drawings of some prototype rail car trucks for some models I'm about to start. He responded to my request.
Tom Houle [thoule@wi.rr.com]
Saturday, March 21, 2009
Protoype 30" Railroads
http://w1.854.telia.com/~u85436044/30inch/index.html
This covers the railroads in California...
| The Yosemite Short Line Railway Co. The Empire City Ry. The Sloat Lumber Co. The Molino Timber Co. The Johnson & Pollock Lumber Co |
L-girders are up!
We also laid out the line for the L-channel that holds the drop ceiling. The crew worked from 7:30 to midnight. Steve, Paul, Bob and my neighbor Mike all dropped in.
The team spent some time talking about how to put the pilings in for the track work. I like the idea of the flex-pilings, and we may try that. Bob had some great ideas about how to put the pilings in. Basically, we are going to have to run some tests. Total time tonight was 4.5 hours.
Thursday, March 19, 2009
More Sprues - 1 hour work
I was looking at the water tower directions and realized that I didn't have the ladders on the paint boards. They were of another color. I found them, trimmed them and put them on the dark gray paint board.
