| 1 | Level the gurney and install locks |
| 2 | Trim back the tight aisle area |
| 3 | Install 1/4" flat top on benchwork |
| 4 | Install HVAC ducts |
| 5 | Build outside return loop |
| 6 | Build trial 2 x 2 scenery test |
| 7 | Seal all benchwork and sand |
| 8 | Paint benchwork top and the entire gurny |
| 9 | Cove back two walls |
| 10 | Install DCC power shelf |
| 11 | Build cypress low relief trees for backdrop |
| 12 | Purchase backdrop material and paint/install |
| 13 | Install ceiling lights |
| 14 | Install drop ceiling |
| 15 | Lay foam islands |
| 16 | Install trackwork |
| 17 | Wire in main DCC bus |
Sunday, June 28, 2009
Latest Priorities for the Swamp