Latest Priorities for the Swamp

1 Level the gurney and install locks
2 Trim back the tight aisle area
3 Install 1/4" flat top on benchwork
4 Install HVAC ducts
5 Build outside return loop
6 Build trial 2 x 2 scenery test
7 Seal all benchwork and sand
8 Paint benchwork top and the entire gurny
9 Cove back two walls
10 Install DCC power shelf
11 Build cypress low relief trees for backdrop
12 Purchase backdrop material and paint/install
13 Install ceiling lights
14 Install drop ceiling
15 Lay foam islands
16 Install trackwork
17 Wire in main DCC bus